32 MW
Installed Capacity
Sto. Tomas, Batangas
Philippines
40,000*
MT CO2e
Annual Emissions Avoided
17,000*
Homes Powered
Maibarara Geothermal’s phase 1 was successfully commissioned in February 2014 while its Phase 2 went online in 2018. Both units showcase stable geothermal power that is virtually unaffected by weather or other factors. Maibaraba Geothermal was the first Renewable project under the Philippine’s Renewable Act of 2008.
*based on net attributable figures as of Dec 2023
Highlights
ACEN Economic Stake:
25%
Project Status: Operating
Start of Commercial Operations:
2014
Plant Specifications:
Fuji Electric turbine
Recognition/s:
Geothermal Power Project – Asian Power Awards 2016, Seoul, South Korea
Partners:
Petro Green Energy Corporation
PNOC Renewables