80 MW
Installed Capacity
Khanh Hoa and Dak Lak
Vietnam
62,000*
MT CO2e
Annual Emissions Avoided
17,000*
Homes Powered
ACEN’s second renewable energy project in Vietnam in partnership with AMI Renewables are the two solar plants located in the provinces of Khanh Hoa and Dak Lak. The project started its operations in 2019.
*based on net attributable figures as of Dec 2023
Highlights
Approx. Economic Stake:
80%
Project Status: Operating
Start of Commercial Operations: 2019
Solar Panel Specifications:
340 and 345 Wp monocrystalline PV modules
Partner:
AMI Renewables