70 MW
Installed
Capacity
Gujarat
India
82,000*
MT CO2e
Annual Emissions Avoided
24,000*
Homes Powered
The 70 MWdc (50 MWac) Paryapt Solar is set in the Amreli District of the State of Gujarat, one of the first states to develop solar generation in India which has its own target to set up 30,000 MW of green power by 2022. The US$38 million solar facility started its power generation in April 2021 and has been supplying energy to Gujarat Urja Vikas Nigam Ltd. (GUVNL).
*based on net attributable figures as of Dec 2023
Project Highlights
Start of Commercial Operations:
2021
Approx. Economic Stake:
80%
Partners:
About UPC Renewables
UPC is a leading worldwide renewable developer with more than 20 years of global experience developing, constructing and operating world-class wind and solar projects.