70 MW
Installed Capacity
Gujarat
India
82,000*
MT CO2e
Annual Emissions Avoided
24,000*
Homes Powered
The 70 MWdc (50 MWac) Paryapt Solar is set in the Amreli District of the State of Gujarat, one of the first states to develop solar generation in India which has its own target to set up 30,000 MW of green power by 2022. The US$38 million solar facility started its power generation in April 2021 and has been supplying energy to Gujarat Urja Vikas Nigam Ltd. (GUVNL).
*based on net attributable figures as of Dec 2023
Highlights
Approx. Economic Stake:
80%
Project Status: Operating
Start of Commercial Operations: 2021