4 MW
Installed Capacity
Mariveles, Bataan
Philippines
2,000
MT CO2e
Annual Emissions Avoided
~900
Homes Powered
The adoption of emerging technologies play a prominent role in
ACEN’s renewables expansion. At the ACEN Tech Hub in Bataan, different energy and energy storage technologies will be tested for possible large-scale use in the Philippines.
*based on net attributable figures as of Dec 2023
Highlights
ACEN Economic Stake:
100%
Project Status: Operating
Start of Commercial Operations:
2022
Plant Specifications:
Renewable energy research facility