140 MW
Installed Capacity
Rajasthan
India
~170,000*
MT CO2e
Annual Emissions Avoided
49,000*
Homes Powered
Marking its first major investment in India, the 140 MWdc (100 MWac) Sitara Solar plant is a US$65 million solar facility located in Rajasthan, a desert state with the highest irradiation in the country. It started power generation in May 2021, and is under a long-term PPA with the Solar Energy Corporation of India (SECI).
*based on net attributable figures as of Dec 2023
Highlights
Approx. Economic Stake:
80%
Project Status: Operating
Start of Commercial Operations: 2021