Sitara solar logo

140 MW

Installed Capacity

Rajasthan

India

~170,000*

MT CO2e
Annual Emissions Avoided

49,000*

Homes Powered

Marking its first major investment in India, the 140 MWdc (100 MWac) Sitara Solar plant is a US$65 million solar facility located in Rajasthan, a desert state with the highest irradiation in the country. It started power generation in May 2021, and is under a long-term PPA with the Solar Energy Corporation of India (SECI).

*based on net attributable figures as of Dec 2023

Highlights

Approx. Economic Stake:

80%

Project Status: Operating

Start of Commercial Operations: 2021

Partners:

UPC Renewables